GuideInfrastructure & networking
How to plan structured cabling for a new office
By Inara Crest Engineering 2 min read
Cabling outlives most of the equipment it connects. Plan outlets, cable category, pathways and labelling before the walls close.
Structured cabling is usually installed once and expected to last through several generations of switches, phones and computers. Decisions made during an office fit-out — how many outlets, which cable category, where the rack sits — are expensive to reverse once ceilings and partitions are finished.
1. Survey what needs to connect
Start with a floor plan and mark every device that needs a wired connection, not just desks.
- Workstations — plan at least two data outlets per desk position.
- Wireless access points, usually ceiling-mounted and powered over Ethernet (PoE).
- IP cameras, access control readers and door controllers.
- Printers, meeting-room displays, IP phones and any building management equipment.
Add spare capacity of roughly 20–30% for growth and layout changes. Running extra cables during a fit-out costs far less than adding them later.
2. Choose the cable category deliberately
A standard copper channel is limited to 100 metres: up to 90 metres of fixed cable plus patch cords. Within that limit, Category 6 supports 10 Gb/s only up to about 55 metres, while Category 6A supports 10 Gb/s over the full 100 metres and handles the heat of higher-power PoE better. For new installations expected to carry Wi-Fi access points and cameras for many years, Cat6A is often the safer choice.
Use fibre for backbone links between floors or buildings, and for any run longer than the copper limit.
3. Plan the rack and pathways
- Locate the communications rack centrally so outlet runs stay within distance limits.
- Give the rack room ventilation, a dedicated power circuit and space for a UPS.
- Use trays, trunking or conduit sized for future cables, and keep data cabling separated from mains power, crossing at right angles where it must.
- Allow for patch panels and horizontal cable managers so patching stays tidy and traceable.
4. Label and document everything
Every outlet, patch-panel port and cable should carry the same identifier at both ends, following a consistent scheme such as the ANSI/TIA-606 administration standard. Keep an as-built floor plan that shows outlet numbers. This turns fault-finding from guesswork into a five-minute task.
5. Insist on test results
Each permanent link should be tested with a cable certifier, and you should receive the test report for every link at handover. A cable that merely passes a continuity check can still fail at higher speeds.
Checklist before installation starts
- Outlet schedule agreed and marked on drawings.
- Cable category and fibre backbone confirmed.
- Rack location, power and cooling confirmed.
- Labelling scheme agreed.
- Test and documentation requirements written into the contract.
Planning an office network? See our infrastructure and networking services.
About the author
Inara Crest Engineering
Engineering team
Written by the Inara Crest Technologies engineering team, who design, install and support software, network, security, power and data centre systems for organisations in Kenya and East Africa.