BlogProject delivery
Running an ICT project with multiple vendors
By Kennedy Ougo, Senior ICT Consultant 1 min read
Most rollout delays happen at the boundaries between suppliers. One plan, clear ownership and staged acceptance keep them in check.
A new office or site rollout can involve a cabling contractor, an equipment supplier, an internet provider, a security installer and a software vendor. Each may do good work, yet the project still slips — usually at the handovers between them.
One plan, one owner
Maintain a single schedule that shows every vendor’s tasks and the dependencies between them: cabling before access points, power before racks, internet before cloud services. Someone must own that plan and the overall outcome.
Make responsibilities explicit
Use a simple responsibility matrix that states who does, approves and is informed about each task. Pay particular attention to interfaces — who configures the switch port the camera plugs into, and who tests it?
Confirm site readiness
Before each vendor arrives, check the conditions they need: finished ceilings, power at the rack, access to the building, equipment delivered. Idle crews and repeat visits are a common hidden cost.
Control changes
Record every change to scope, with its effect on cost and schedule, before work proceeds. Informal changes are the main source of end-of-project disputes.
Accept in stages
- Test each component when it is installed — cable test reports, device configuration.
- Test the integrated system end to end.
- Hand over documentation, credentials and warranties before final payment.
If you would rather have one accountable team coordinate the whole rollout, see our ICT project management services.
About the author
Kennedy Ougo
Senior ICT Consultant
Kennedy Ougo writes about ICT project delivery, equipment deployment and intelligent transport systems.