Site readiness checklist before installers arrive

By Inara Crest Engineering 1 min read

Idle installers and repeat visits are hidden costs. Confirm access, power, space and approvals before every installation.

Every installation depends on the site being ready. Check these items a few days before each team is scheduled.

Access

  • Building access arranged for the dates and times, including after hours if needed.
  • Contact person on site with authority to make decisions.
  • Parking, loading and lift access for equipment.

Building works

  • Civil works, ceilings, trunking and painting complete where equipment will be installed.
  • Rooms for racks and equipment cleared and lockable.

Power and environment

  • Power available at the rack and equipment locations.
  • Cooling in place for server and network rooms.
  • Earthing in place where required.

Equipment and materials

  • Equipment delivered, checked against the order and stored securely.
  • Cabling and consumables on site.

Approvals and safety

  • Permits obtained where required.
  • Safety briefing arranged and site rules shared with the team.

Information

  • Final drawings, outlet schedules and configuration details issued.
  • Network details, accounts or licences the installers need.

See our ICT project management and installation services.

About the author

Inara Crest Engineering

Engineering team

Written by the Inara Crest Technologies engineering team, who design, install and support software, network, security, power and data centre systems for organisations in Kenya and East Africa.

All guides