Resources & technical library
Practical guidance for planning, building and running technology.
Guides and articles from the Inara Crest team on software, AI, networks, security, power, data centres, hosting, transport systems and IT support — written to help you make better decisions, whether or not you work with us.
Plan and specify
What to decide and document before you request quotes or start installation.
Build and install
Practical standards for cabling, power, security systems and business software.
Operate and support
Keeping systems maintained, secure and documented after go-live.
Showing articles for Power & Smart FacilitiesShow all
3 results in Data centres
Showing 3 of 3 articles
- Guidedata centres
Commissioning tests for a new server room
Prove power, cooling, monitoring and failover work under realistic conditions before production systems move in.
By Inara Crest Engineering 1 min
Read the guide - Blogdata centres
Power density planning per rack
How much power each rack draws determines cooling, circuits and PDUs. Plan density deliberately rather than discovering it.
By Vicky Ogola 1 min
Read more - Guidedata centres
Server room checklist: power, cooling, security and monitoring
A practical checklist for turning a room with servers in it into a server room you can rely on.
By Inara Crest Engineering 1 min
Read the guide
Need help applying this to your site?
Our engineers can assess your requirements and turn a guide into a design, a quotation and a delivered system.
Speak to us directly
Monday – Friday, 8:00 am – 5:00 pm
